Discrete modelling of lime kilns (2016)

KERNEOS Aluminate Technologies wishes to exploit the bauxite fines generated during the extraction, conditioning and transport of bulk bauxite, which are currently unused. To achieve this objective, the PARC project was built around 2 academics and 4 industrial companies, experts in their field.

Numerical modeling of dredged sand filled geotextile tubes behavior under seismic loading (2016)

A nearshore 120m long causeway is planned for the Mozambique LNG TMOF Project. Geosintex S.R.L. proposes a structure composed by synthetic geotubes (see Figure) for protecting the road against erosion. The mechanical behavior of this structure must be understood better. The evaluation of the potential for liquefaction of the road sandy basement and the geotubes filling material is of particular interest.

Definition and flow analysis of UFM model for the Forsmark site (2016)

The Forsmark site is studied in the context of the Swedish nuclear disposal project. One key step is defining, at the relevant depths ‐ from 200 to 400m ‐ a Discrete Fracture Network (DFN) model. The DFN modeling framework is based on simplified rules that mimic the kinematic processes governing fracture nucleation, growth and arrest (models are named UFM for likely Universal Fracture Model).

Regional-Scale Stress Model of the Stockholm Area (2016)

New metro lines are planned in Stockholm, comprising a total length of approximately 20 km with 10 new stations, mostly located underground. One of the new lines will pass under Saltsjön (a bay of the Baltic Sea) and through a major regional large-scale geological structure. The stress magnitudes and orientations around the structure are highly uncertain, and stress measurements are not practically possible near the structure. To quantify possible stress conditions near the structure, discontinuum threedimensional numerical modeling was conducted.

Liquefaction Risk Mitigation using Jet Grouting Cells (2016)

Trevi Group has been involved in the design-build of a commercial building in Turkey in an area prone to liquefaction. The foundation of the building is located approximately 10 m below original grade, which still leaves about 10-12 m of potentially liquefiable sand underneath the bottom slab.

Geometry Model for the Follo Line Project (2016)

The Follo Line project is the largest railway project in Norway in modern times. The Follo Line is a high-speed railway partly in tunnel from the traffic hub at Ski to Oslo central station. The project comprise a 20 km long tunnel. The new railway is passing through central Oslo, beneath existing infrastructure which creates challenging conditions due to overlapping tunnels and multiple intersections.

Discrete modelling of lime kilns (2016)

KERNEOS Aluminate Technologies wishes to exploit the bauxite fines generated during the extraction, conditioning and transport of bulk bauxite, which are currently unused. To achieve this objective, the PARC project was built around 2 academics and 4 industrial companies, experts in their field.

Parking Ramp over Light Rail Station (2016)

A parking ramp expansion has been proposed at Terminal 1-Lindbergh to be constructed over the north end of the Metro Transit Light Rail (LRT) station. Itasca assessed the magnitude of the principal impacts by conducting three-dimensional geostructural analyses of the LRT station using 3DEC. Of the six designs evaluated, all but one option were predicted to be geostructurally feasible.

Reinforcing a tunnel face using grouted fiberglass bolts (2016)

The aims of this work is to study the influence of face reinforcement on the tunnel stability and to check if the creep behavior of the rock may induce a potential jamming of the TBM during the excavation stop.

Effect of yielding supports on the behavior of deep tunnels (2016)

Project on the extension works for the Underground Research Laboratory (URL) at Bure (France).

Tunneling in Mixed Face Conditions (2015)

A research project on tunneling in mixed face conditions (rock-soil) was carried out with the aim to increase the knowledge and to better understand deformation mechanisms when these particular conditions arise. A back analysis of a case study involving the tunnel passage under the Maria Magdalena church was performed as a second task of the project, in which soil stratigraphy, rock/soil reinforcement, and extraction sequence were simulated explicitly and in detail.

Guidelines on Design of Rock Excavations (2015)

In 2009, the Swedish National Rail Administration presented a handbook with guidelines for the design of the load-bearing structure of rock tunnels. Following the merging of several transport administrations into The Swedish Transport Administration, an updated version of the handbook was required.

Hopper discharge and flow comparison against experiments (2015)

Evaluate the feasibility of using the distinct‐ element modeling to study the flow and segregation of frictional particles without cohesion.

Simulate an experimental test corresponding to the charge/discharge of a scale model batch hopper.

Hydrogeologic and Geochemistry Support for Open Pit and Underground Mining at Ernest Henry Mine (2015)

The Ernest Henry Mine is a large open pit copper mine with deeper mineralization that was targeted for underground mining. A Feasibility Study (FS) was conducted to evaluate the potential for mining of the underground component by sublevel‐caving methods.

Ore Pass Design - A Modeling Study (2015)

The LKAB mining company is currently carrying out investigations for a potential continued mining at depth in the Malmberget mine. Part of this work involves design of ore passes. The ore passes are a vital part of the transportation chain, and has, historically, been subject to extensive instabilities leading to closing and re-development of ore passes.

1 2 3 4 5 6 7 8 9
Latest News
  • Now Available from ITASCA: Innovative Machine Learning Tool for FLAC3D/FLAC2D V9.2 Experience the Future of Geotechnical Modeling with ITASCA Software V9.2: Introducing Machine Learning Models...
    Read More
  • Experience the Future of Geotechnical Modeling with ITASCA Software V9.2 Experience the Future of Geotechnical Modeling with ITASCA Software V9.2: Introducing Machine Learning Models and...
    Read More
  • Thank You to our Summer Interns ITASCA Minneapolis is lucky to have welcomed nine amazing and dedicated summer interns in our...
    Read More